Construction Activities

23.       STATUS OF INFRASTRUCTURE IN JNV’S

 

I

Area of land  allotted (in acres)

 Whether land transferred in the Name of Samiti

 

 

Vidyalaya shifted to permanent buildings on

: 33 Acres. 

: Yes,

   Only 30 Acers of land has been transferred & available in the Vidyalaya records & rest of the 03 Acers are conditionally transferred in the formal way which has not yet recorded on paper. 

 02 OCTOBER 1998

ii

Status of Boundary Wall

a.  Brick Wall

 

b.  Barbed wire fencing

: Completed  with BRICK WALL

But in some places it is needed to be raised up to 03 feet height further, and barbed wire fencing needed

iii

Permanent buildings constructed

: CPWD pattern

iv

School building

: Completed

v

Dormitories

:  Boys 4 nos

   with Warden Residence 08  Nos.

 

 

 

:  Girls 2 nos

   with Warden Residence 04 Nos.

vi

Kitchen/dining Hall

No. of shifts required for all students  to take food

 

 

:  Complete / not complete, Area ______

vii

Principal Residence

:  ___ No

viii

Staff Quarters

 

 

 

: Type III = ______ Nos.

  Type II = _______ Nos.

  Type  I  = _______ Nos.

  SP Sheds converted into Staff Qrs.:_____ Nos.

ix

M.P. Hall

: Available / not available

x

Workshop

: Available / not available

xi

Type of O.H. Tank

 

Its capacity

 

Present Status

: Shaft type / Column based

 

:  _______ litres

 

: Working satisfactory / not satisfactory

xii

U.G. tank

 

Its capacity

 

Present Status

 

:  _______ litres

 

: Working satisfactory / not satisfactory

xiii

D.G. Set

 

 

 

 

:  Available / not available

: _____________ make

:   ______ KV

: Working / not working

: Year of procurement

xiv

Sewage Pump

: ________ H.P.

xv

Water Pump

: ________ capacity

xvi

Electrification

 

Electric connection

Sub Station building

Street lighting

 

Numbers of hrs. during day when power supply is available on an average.

 

 

 :  Rural / Urban Feeder

:  Complete/ Incomplete

: __________ Nos. of Poles

 

: ________ hrs.

  

xvii

Playfields

400 metre track

40 x 30 metre basket ball court

40 x 30 metre volley ball court

 

 Available/ not available

:  _______Nos.   – Available / not available

:  _______Nos.   – Available / not available

xviii

Water supply

Tube Well

Hand pump

Connection from PHED

 

: Potable,  ______ Nos.-  working / not working

: Potable, ______ Nos.-  working / not working

:  ______ hours supply in a day

 

xix

Rajiv Gandhi Smriti Van

:  Available / not available

xx

Fire fighting arrangement

:  Working / not working

xxi

Last date of cleaning of

(a)   Septic tank

(b)   Water tanks

 

:

:

xxii

Whether area around transformer is fenced

:  Yes  /  No

xxiii

Whether open wells, if any, are covered from top

:   Yes / No

xxiv

Works taken up under M&R fund during current year and last year:-

:

Year

Name of work  (M&R)

Expenditure

(Rs. In lacs)

Cumulative expenditure during the year